Writing Task 2: Responding to Survey Questions

Time Limit: 25 minutes

Read the following information.

Tunnel and Bridge Survey

The city council is considering plans to improve transportation connecting the two cities through the existing tunnel. One option is to double the size of the current tunnel to increase traffic capacity. The other option is to build a new bridge to replace the aging tunnel entirely. They are asking residents to share their opinions on these proposals.

Choose the option that you prefer. Why do you prefer your choice? Explain the reasons for your choice. Write about 150-200 words.

 

Option A: I prefer to double the size of the existing tunnel to improve traffic flow while maintaining the current route.
Option B: I prefer to build a new bridge to replace the old tunnel, providing a modern and possibly safer connection.

*NOTE: This sample test is not recording your response.

写作框

Timer =
Words: 0